asonry, almost without a break along the entire subway construction, has made it unnecessary to provide an extensive sy
h as by leakage through a cable manhole cover or by the breaking of an adjacent water pipe, or the li
e of the adjacent sewer, the carrying of the water away has been easy to acco
, at each depression where water is liable to collect, a well, or sump pit, has been constructed just outside the shell of the tunnel. The bottom
is necessary to maintain pumping devices, it has not been possible to employ a uniform design of pumping equipmen
pump employed, as the employment of com
t is necessary to maintain a pumpi
e lowest point o
ersection of Elm
h Street in the M
rsection of 46th S
ection of 116th Stre
section of 142d Str
ection of 147th Stre
144th Street in Ha
center of the Ha
section of Gerard Av
pumping plants are maintained, it is necessary t
el constructed under the Subway
e sub-subway at 42d
tal of the Lenox Avenue e
e southerly end of t
e northerly end of t
portal at Bergen Ave
ump wells which are not easily accessible, and the air lift was selected for the reason that no moving parts are conveyed in the air-lift construction other than the movable ball float and valve which control the device. The air lift consists of concentric piping
perated ejectors have been employed, for the reason that the conditions di
ing pumps will be employed. These pumps will be placed in readily accessible locations, where air lif
scends from the portal, it was considered best to employ large submerged centrifugal pumps, operated by reciprocating air engines. Also for the portal, at Loc
r line which supplies air to the switch and signal system, but break-down connections will be