Chapter 4 THE BUILDING OF THE TSAVO BRIDGE

Word Count: 1757    |    Released on: 04/12/2017

his was the widening of a rock cutting through which the railway ran just before it, reached the river. In the hurry of pushing on the laying of the line, just enough of the rock had orig

g of men were laying the foundations of a girder bridge which was to span a gully between this cutting and Tsavo Station. This would have taken too long to erect when railhead was at the place, so a diversion had been made round it, the temporary track leadi

ng member of my staff. The day had been exceedingly hot and we were both correspondingly tired when our work was finished, so my companion suggested that we should build a raft and float down-stream home. I was rather doubtful, of the feasibility of the scheme, but nevertheless he decided to give it a trial. Setting to work with our axes, we soon had a raft built, lashing the poles together with the fibre which grows in abundance a

r the Tsavo river-were going on apace. These involved, much personal work on my part; cross and oblique sections of the river had to be taken, the rate of the current and the volume of water at flood, mean, and low levels had to be found, and all the necessary calculations made. These having at length been completed, I marked out the positions for the abutments and piers, and the work of sinking their foundations was begun. The two centre piers in particular caused

nd knelt on one knee, crouching down among the ferns. There I had scarcely time to load when over flew a bird, which I missed badly; and I did not have another chance, for Brock had got to work, and being a first-rate shot had quickly bagged a brace. Meanwhile I felt the ground very hard under my knee, and on examination found that the bank of the ravine was formed of stone, which extended for some distance, and which was exactly the kind of material for which I had long been fruitlessly searching. I was greatly delighted with my unexpected discovery, though at first I had grave misgivings about the distance to be traversed and the difficulty of transporting the stone across the intervening country. Indeed, I found in the end that the only way of getting the material to the place where it was wanted was by laying down a tra

ty in the bed of the ravine. An amusing incident occurred one day when I was taking a photograph of an enormous block of stone which was being hauled across one of these temporary bridges. As the trolley with its heavy load required very careful manipulation, my head mason, Heera Singh, stood on the top of the stone to direct operations, while the overseer, Purshotam Hurjee, superintended the gangs of men who hauled the ropes at either end in order to steady it up and down the inclines. But we did not know that the stream had succeeded in washing away the foundations of one of the log suppor

et its own momentum take it down the slope, moderating its speed when necessary by a brake in the shape of a pole, which one of them carried and by which the wheels could be locked. On this occasion, however, the pole was by some accident dropped overboard, and down the hill we flew without brake of any kind. Near the bridge there was a sharp curve in the line, where I was afraid the trolley would jump